How to Establish a Coal Power Plant in Turkey is a fundamental question for energy investors looking to enter the Turkish electricity generation sector. Turkey’s energy demand continues to grow due to industrial expansion, population increase, and urban development. While renewable energy projects are rising, coal power plants remain a significant part of the national energy mix, supported by domestic lignite reserves and imported coal supply chains.
1. Legal Framework
Coal power plant establishment is primarily regulated by the Electricity Market Law No. 6446 and related regulations issued by the Energy Market Regulatory Authority (EMRA). Investors must comply with additional environmental, occupational safety, and zoning laws.
Key institutions include:
- EMRA (Energy Market Regulatory Authority) for licensing
- Ministry of Environment, Urbanization and Climate Change for environmental permits
- Ministry of Energy and Natural Resources for energy policy compliance
2. Choosing the Legal Entity
Before applying for permits, the investor must establish a company in Turkey. The most common structures are:
- Joint Stock Company (A.Ş.): Preferred for large-scale energy projects, minimum capital 50,000 TRY.
- Limited Liability Company (Ltd. Şti.): Minimum capital 10,000 TRY, quicker setup but less flexible for large-scale financing.
Foreign investors can own 100% of the company shares without local partnership requirements.
3. Licensing Procedures
The following licenses are mandatory:
- Pre-Licence: Grants the right to prepare the project, secure financing, and complete necessary permits before construction.
- Generation License: Allows electricity production for commercial purposes.
The pre-licence phase includes securing grid connection approval from TEİAŞ (Turkish Electricity Transmission Corporation) and ensuring compliance with zoning regulations.
4. Environmental Compliance
Environmental compliance is a critical step in How to Establish a Coal Power Plant in Turkey. An Environmental Impact Assessment (EIA) report is mandatory. The EIA process evaluates the potential effects of the project on air quality, water resources, biodiversity, and public health.
Key environmental obligations:
- Emission control systems to limit air pollution
- Waste management and ash disposal plans
- Water usage permits for cooling systems
Failure to comply with EIA requirements can lead to project cancellation or heavy fines.
5. Land Acquisition and Zoning
Investors must secure suitable land that meets zoning requirements for industrial energy facilities. Land can be privately owned or leased from the state. Any change of land use designation must be approved by relevant local authorities.
6. Construction Permits and Safety Regulations
Once the EIA and pre-licence are approved, construction permits are obtained from the local municipality or provincial administration. The project must comply with Law No. 6331 on Occupational Health and Safety, ensuring safe working conditions during both construction and operation.
7. Financing and Incentives
Coal power plant projects require significant capital investment. The Turkish government may provide incentives under the Investment Incentives Program, including:
- Customs duty exemption on imported equipment
- VAT exemptions
- Tax reductions
- Social security premium support
Projects in underdeveloped regions may qualify for higher incentive rates.
8. Operation and Compliance
After construction, the plant must pass operational inspections by EMRA before receiving the final generation license. Continuous compliance with emission limits, waste management laws, and occupational safety standards is required throughout the plant’s lifecycle.
9. Special Considerations for Foreign Investors
Foreign investors may face additional procedures, such as security clearance if the site is near sensitive zones. Partnering with a Turkish law firm can help navigate bureaucratic processes, ensure full compliance, and reduce project delays.
Conclusion
Understanding How to Establish a Coal Power Plant in Turkey involves navigating complex licensing, environmental, and operational regulations. From forming a company and securing land to meeting environmental standards and obtaining generation licenses, every step must be planned with legal precision. With proper guidance and compliance, investors can take advantage of Turkey’s growing energy market while maintaining environmental responsibility.