A company that already holds a Turkish marketing authorisation can negotiate with a new contract manufacturer long before it is ready to sell a batch from that manufacturer. The central question is not whether the contractor can ship on a promised date. It is whether the proposed site and activities are covered, the product dossier permits the change at the relevant time, and the agreement assigns batch release to the appropriate responsible manager. A signed supply contract and a successful shipment do not answer those questions.
This guide concerns the outsourcing of an ordinary non-sterile finished tablet for the Turkish market, with the same marketing authorisation holder throughout. It does not address the transfer of a marketing authorisation to a new owner, nor does it assume the same requirements for a different product class. The example is hypothetical. Its purpose is to show what investment committees, quality teams and deal counsel should verify before agreeing to a binding switch date.
Put the site, product and batch in three separate columns
First, ask what activities the prospective contractor is authorised to perform at the proposed address. A site’s credentials are not a substitute for matching the actual work to the facility’s scope. Identify the legal entity, facility address and each activity that the proposal places there. Do not treat a corporate presentation describing several factories as evidence that the selected factory can perform them all. Request the current authorisation and scope documentation and reconcile those documents with the draft contracts.
Second, ask where each activity sits in the product’s authorisation dossier. A permitted site is not necessarily already the designated site for a particular medicine or role. TİTCK’s July 2026 variations guideline distinguishes changes to finished-product manufacturing sites, addressed in section Q.II.b.1, from changes to sites responsible for batch control, testing or release, addressed in section Q.II.b.2. The documents, conditions and procedural classification depend on the proposed change. Obtain a written regulatory mapping of the actual plan, including linked changes and when each may be implemented. Avoid assuming that changing only the laboratory or release location is administratively irrelevant.
Third, ask what evidence must exist for a specific batch to be released. The first two questions do not guarantee that any particular batch qualifies. Agree who assembles the records, who can see the underlying documents, who has authority to put or keep a batch on hold, and whose responsible manager is accountable for the release decision. Build those questions into the decision to move supply, not just into the quality team’s work after signature.
What the contract must do under Article 22
Article 22 of Türkiye’s Regulation on Manufacturing Sites for Human Medicinal Products requires contracted manufacturing and associated outsourced work to be governed by a contract that clearly allocates the parties’ responsibilities. It calls for clarity on matters including complaints, recalls and contracted analyses, the contractor’s compliance with Good Manufacturing Practice (GMP), and which party’s responsible manager is responsible for releasing each batch to the market. The assignment of contractual responsibilities does not eliminate responsibilities toward the regulator.
As a practical drafting choice, use a commercial agreement and a quality agreement or schedule that cross-reference each other. The commercial terms can cover pricing, forecasts, capacity and delivery. The quality provisions should make the oversight arrangements usable in practice. Specify which terms control if the promise to ship conflicts with a quality hold. An on-time delivery target must never operate as a deeming provision for a release that has not been authorised. Equally, the contractor should not be penalised for exercising a defined, legitimate safety hold merely because it occurred near the delivery deadline.
Article 22 also addresses inspection obligations and bars subcontracting of assigned work without the commissioning party’s written permission. Make the allowed scope, entities and sites identifiable in a schedule rather than using an open-ended category such as “qualified partners.” Written permission is part of the contract route, not a substitute for checking the dossier or any applicable authorisation requirement. Contractual oversight must reach the records and activities that support the final decision even if an approved third party is responsible for only one part.
Make release authority usable on an ordinary working day
A quality agreement should describe the handoff between the contractor’s quality team and the person responsible for release. Distinguish completion of activities at the plant, completion of the agreed documentation package and the decision to release to the market. The commercial team may track all three as milestones, but they should not share a single ambiguous label such as “batch accepted.” Record what event permits invoicing, what event permits physical movement, and what event permits onward distribution under the applicable arrangements.
The responsible manager should be identified by role and entity, with a documented alternative if permitted and necessary. Ask who maintains the contact information, how the other side is notified of any change, and how pending decisions are handled when the named contact is unavailable. A workflow that depends on an email address held by just one individual is fragile even if the allocation of responsibility is correct on paper.
Give the release decision-maker timely access to the evidence needed to assess compliance, including relevant deviations and unresolved issues. Build a clear escalation route rather than specifying a release deadline that can be met only by overlooking gaps. If an investigation is open, separate the communication deadlines from the substantive decision. The parties can agree to acknowledge and triage an alert quickly without promising a particular outcome. Ask which staff can mark a batch as held, who can clear that status, and how logistics, customer service and the finance team will see that a shipment must not progress.
Request evidence before committing capacity or inventory
The checks below address distinct failure modes. Give each request an owner and an internal decision date, and keep the original evidence with the agreed conclusions. If the contractor is reserving capacity, distinguish evidence that can follow before the handover from evidence without which the arrangement should not move forward.
| Issue | Documents to request | Risk | Impact on the transaction |
|---|---|---|---|
| Site and scope | Current authorisation and scope by entity, address and activity | A different site or activity is assumed to be covered | Resolve before binding supply or capacity commitments. |
| Product dossier and route | Current site list, proposed changes and signed assessment | Manufacturing, testing or release site is not usable as planned | Tie cutover to documented applicability and timing. |
| Quality and release | Agreement, release responsibility and sample record index | Delivery or invoicing is mistaken for lawful release | Create a separate release milestone and effective holds. |
| Contracted activities | Named sites, approved service scope and consent records | Work moves to an unapproved provider | Prohibit silent substitution and require reassessment. |
| Complaints and exit | Contacts, distribution reconciliation and record access | Neither party can reconstruct earlier supply or investigate a complaint promptly | Preserve access and cooperation after termination. |
A useful authorisation matrix lists the proposed change, relevant dossier section, expected procedure, supporting evidence, person responsible for filing, and earliest date the activity can be relied on for commercial supply. Use it to track what changes if the contract manufacturer replaces an affiliate, laboratory or packaging operation during negotiation. Do not leave that decision to a generic approval clause: identify exactly what change must stop the project until it is reassessed.
Ask the contractor to distinguish known open action items from matters it has not yet checked. The decision should reflect the status of the particular site and scope, not merely its experience with the product category. If some evidence cannot be shared in the ordinary diligence folder, set up controlled access and agree who may review it. Confidentiality arrangements should protect legitimate proprietary information without making the records needed for lawful oversight unavailable.
Provide for changes, continuity and a failed switch
A change-control clause should describe which events need an internal assessment, which require the other party’s consent and which must be evaluated for a regulatory variation or another step. Do not make those categories interchangeable. For example, a permitted contractual change can still affect the dossier. A change in a third-party laboratory, an address, the release location or the scope of work is a reason to consult the approved map rather than infer that the medicine remains unchanged in every relevant respect.
Plan continuity before telling customers that supply is moving. Keep the outgoing arrangements available as long as they remain applicable and necessary, and test any proposed overlap for contractual and regulatory feasibility. Distinguish usable inventory from stock that is held, nearing expiry or still awaiting the release decision. When inventory is priced into the deal, spell out who pays for rejected or obsolete units and how work in progress is treated. Do not shift risk between parties by calling an unresolved batch usable inventory.
A workable exit plan also covers access to records and ongoing assistance after termination. Decide when records will be transferred or made available, who will respond to earlier complaints, and how the departing contractor will help investigate a batch it previously handled. Where two sites may supply close together, document the cutover by batch and product presentation so distribution records can be reconciled without guesswork. Contract terms should not delay required reporting or action while the parties dispute whose conduct caused an issue.
Article 23 addresses complaint records and the ability to withdraw product promptly, supported by effective distribution records. The quality agreement should therefore identify the recall coordination contacts, what data will be shared and who will verify distribution reconciliation. Separate those operational responsibilities from reimbursement after the event. A cost-allocation dispute is not a reliable mechanism for running a withdrawal.
Worked example: an authorised plant offers a different laboratory
Assume a company holding a Turkish authorisation for an ordinary tablet wants to move production to a new contract manufacturer. The bidder presents site documentation and expects to use a third-party laboratory in another city. Its standard terms say it may substitute comparable laboratories and that commercial acceptance occurs on delivery. The company wants the first lot for an upcoming supply cycle and would like to terminate its outgoing arrangements shortly after the new agreement is signed.
The first action is to document the separate roles of the manufacturing facility, laboratory and release decision-maker. The regulatory team compares those roles with the current product dossier and identifies the applicable route for the site change, including whether the laboratory change is separately relevant. The parties remove the unilateral substitution right for the contracted work and document which named provider is authorised in writing, without making approval under the contract stand in for regulatory assessment. They agree that a delivery receipt does not release a batch to the market.
Set a decision date for the switch, not just a delivery date. If the site and testing arrangements cannot lawfully be used in time, or if the first batch lacks its required release documentation, defer that part of the switch. Maintain existing lawful supply if possible while the deficiency is resolved. The commercial terms can address unused capacity, transitional services and purchasing obligations; they cannot authorise market release. This sequence makes the business decision visible before the old supply option disappears.
Checklist before approving the first commercial batch
- List all sites and entities, including any contracted testing and release activities.
- Match each authorised activity to its facility and associated dossier entry.
- Record how the applicable variation procedure and timing have been assessed.
- Put Article 22 responsibilities, written subcontracting permissions and quality oversight in the signed agreement.
- Identify the responsible manager’s role and verify records, deviation escalation and hold controls.
- Confirm commercial delivery and regulatory release are separate milestones.
- Reconcile inventory and preserve lawful supply if the cutover cannot proceed.
- Check complaint and recall contacts and secure continuing record access.
Frequently asked questions
Can a GMP certificate alone show that the switch is ready?
No. It is one part of evaluating the proposed site and scope. Check the actual entity, address and activities, the product-specific dossier position and the evidence needed for the individual release decision. In particular, establish whether the manufacturer is also the site responsible for testing or release instead of assuming all responsibilities sit at one address.
Does every site change require the same variation procedure?
No. TİTCK’s guideline uses separate entries with specified conditions, documents and procedure types. Evaluate the exact change, whether testing or release is affected and the point at which implementation is permitted. A calendar copied from another product is not a reliable basis for a binding supply date.
Can the parties contract away regulatory accountability?
No. Article 22 requires the contract to define responsibilities but says this does not remove responsibilities toward the Authority. Allocate decision-making and evidence access concretely. Deal separately with commercial risk, remedies and indemnities, which do not replace regulatory duties.
Is a replacement laboratory only a purchasing decision?
Not necessarily. Ask whether the work is subcontracted, whether written permission covers it, and how the change affects the product dossier or applicable site requirements. A lower price or similar testing scope is not enough to answer those questions. Make the laboratory change subject to documented assessment before relying on it.
Official sources
- Regulation on Manufacturing Sites for Human Medicinal Products, Articles 22 and 23.
- Regulation on Variations to Authorised Human Medicinal Products, Official Gazette, 18 December 2021.
- TİTCK variations guideline, 22 July 2026 revision, Q.II.b.1 and Q.II.b.2.
This article provides general information for transaction planning. It does not classify a specific variation or determine whether a particular batch can be released.

No Responses